Large investments before first income: VAT and tax benefits have to work from construction.

The Subsector

Solar and wind parks require important investments in ground, equipment, imports and construction well before generating income. That pre-operative period accumulates VAT that can be recovered without waiting for the project to operate.

At BP HH we recover the VAT from construction, imported your team with our licensed customs broker, used your advanced machinery production and helped him fund your infrastructure.

Subsector Challenges

01

Pre-operational VAT

Refund balances generated before they have an income to be requested with sufficient support.

02

Import Of Equipment

Panels, wind generators, investors and processors with strict customs controls.

03

Keep The Benefit

The accelerated deduction requires keeping equipment in operation for the minimum period established by law.

What You Should Know

Do Not Wait To Operate

The VAT of the pre-operative period can be requested as a refund before generating income.

Deduction With Conditions

The benefits of an accelerated deduction are lost if the equipment ceases to operate before the minimum period.

RESULT

Capital released from construction and well-earned tax benefits.